mitsubishi power systems
steam turbine internal alignment
The Project Scope
Mitsubishi® Power Systems mobilized to perform an unplanned outage on the steam turbine portion of a cogeneration power plant. Mitsubishi® needed to have an extremely accurate laser alignment on the steam turbine to ensure that there would be no issues on startup and the turbine would operate reliably. In addition this outage had to be conducted as quickly as possible because it was holding up the process.
acquip performance
ACQUIP mobilized to the job site quickly. We were able to steam line the measurement process by taking readings using the ACQUIP proprietary bracketing while other work was being performed. The tops on readings were combined with other values to create the optimal alignment target for the unit. The alignment was performed at rapid pace while ensuring the accuracy of the moves.
results
ACQUIP shortened the outage several days by adapting methods and procedures to the outages unique requirements, completing the alignment ahead of schedule. The unit was started up with no rubs and gained efficiency.
For more info about our steam turbine alignment services contact us at +1 305 538 7101 or email us at info@acquip.com.
Mitsubishi Power Systems and company names are trademarks™ or registered® trademarks of their respective holders. Use of them does not imply any affiliation with or endorsement by them. Mitsubishi Power Systems is a trademark of Mitsubishi Hitachi Power Systems Americas, Inc.